How does your engineering team confirm a steam system is safe to open?
BMA Safety Alert 26-04 highlights injuries during steam-system maintenance. Isolation can leave stored heat and trapped fluid, while leaking valves or restricted drains can undermine safety checks.
A closed valve and a zero pressure reading may leave hazardous heat or trapped fluid inside the system.
Before maintenance:
✅ Verify isolation, drainage and venting.
✅ Allow sufficient cooling.
✅ Check safe access and escape arrangements.
✅ Stop if safe conditions cannot be confirmed.
Masters and chief engineers should review isolation verification, cooling time and access arrangements. Company teams should check piping drawings, modification records and engineering handovers.
Before the next maintenance job, confirm who verifies safe conditions—and what evidence supports the work authorisation.
The alert provides safety recommendations, with no new international regulatory deadline.
#NisMan #MaritimeSafety #ShipManagement #ISMCode
At Sea or Ashore — IBICON Your Safety Score
![]()